Saudi Conventions & Exhibitions General Authority
The primary authority for exhibitions and conferences: event classification, organizer eligibility, venue suitability and programme approval.
SCEC & GEA
Most events are not lost to design or budget. They are lost to a regulatory file that started too late. AWJ prepares, submits and follows the file through to an issued permit — as part of a full package, or on its own.
How it runs
We classify the event against SCEC and GEA criteria and confirm exactly which authorities it falls under. Getting this wrong at week one is what costs dates at week ten.
Commercial registration, venue contract, layout drawings, safety plan, crowd capacity calculations, insurance and supplier credentials assembled into the format each authority expects.
Filing with the General Entertainment Authority (GEA) or the Saudi Conventions & Exhibitions General Authority (SCEC), and chasing the file through review rather than waiting on it.
Safety approvals, fire and evacuation compliance, and the municipal and venue permissions that sit alongside the primary permit.
Permit issued and handed over, with on-site compliance during build and show days so nothing jeopardises it once the doors open.
Standalone
You are producing the event yourself and need the regulatory side handled. We prepare the file, submit it, follow it through review and hand you the permit.
Inside a full package
Licensing is scheduled alongside design, build and technical production from day one — so the permit timeline shapes the production timeline instead of colliding with it.
Questions