Exhibition stands
Shell-scheme upgrades through to custom island stands, built around sightlines and the route a visitor actually walks.
Stand & booth design and build
AWJ designs and builds exhibition stands, pavilions and stages in Riyadh and across the Kingdom — from the first concept and 3D visual through technical drawings, production, installation and dismantling. Built on architectural restraint, so the brand is what people see, not the stand.
The problem
An exhibition hall is a competition for attention, and the instinct is to fill every surface. The result is a stand so dense that a visitor walking past at three metres per second reads nothing at all. We design the opposite way: one idea, held at scale, with enough emptiness around it that the eye lands where we want it to.
What we build
Shell-scheme upgrades through to custom island stands, built around sightlines and the route a visitor actually walks.
Large-footprint pavilions over 3,000 square metres, with internal zoning for meetings, display and hospitality.
Conference stages, keynote platforms and press backdrops engineered for camera as much as for the room.
Frames and graphics designed to be rebuilt at the next show, so the second exhibition costs a fraction of the first.
How it runs
What the stand is for: product launch, lead capture, government presence or brand statement. The objective sets the plan, not the floor size.
Two or three directions presented as sketch concepts, so the direction is agreed before anyone invests in detail.
Photoreal 3D of the approved direction from visitor eye level, including lighting and finishes, so there are no surprises on build day.
Construction drawings, rigging and load calculations, electrical layouts, and the documents the organizer and Civil Defence need to approve the build.
Joinery, printing, flooring, lighting and AV produced and pre-assembled in the workshop, then quality-checked before it leaves.
Delivery, installation, supervision through show days, then dismantling and site clearance within the organizer deadline.
Finish level
Exhibition builds take abuse: forklifts, hundreds of hands, and a dismantle crew working against the clock. We specify accordingly — and we would rather tell you a finish will not survive four show days than deliver something that looks right only in the 3D.
Why AWJ
Stand build, technical production, hospitality and permits sit in the same company, so the stand is not fighting the AV supplier for power or space.
We prepare the technical file the organizer and Civil Defence actually ask for, which is where most first-time exhibitors lose a week.
How a stand comes apart is designed in at the start, which protects both your deadline and the reusable parts.
Questions
Request a quote
Send the show, the space and what the stand is for. We come back with a concept direction, a build approach and a budget range.
Our team will contact you on the details you provided, within one working day (Sun–Thu, 8:00 AM – 10:00 PM).